This website is now archived. To find out what BERG did next, go to www.bergcloud.com.

Post #7147

Week 368

OK, so I’m still relatively new to week notes (and all this number stuff), so, unlike other folk in the studio, I find the number thing quite interesting, which, is rather annoying, as 368 is bit rubbish. That said, it is a song by Jamie T and a bus route that goes past my old hangout in Chadwell Heath. Do with that what you will.

This week in the studio, things are hotting up. Somewhat because Alice is in shorts, but mainly due to the impending launch of Little Printer, and a whole host of other exciting projects. This is what we’re all up to:

Alice is finishing phase one of our shop which is looking lovely, and more importantly, works. She is also spending time prepping for Saturday’s ‘practice hack day’ which looks to be lots of fun.

Nick is dealing with some firmware and coding, and working with Andy to finish tweaking boards. Andy is also ‘looking at plastics’. I imagine this means he’s at the checkout at Tesco watching people struggle to open the bags, but there’s no way he’d be watching the bags and not eating the food, so one can presume it is to do with Little Printer.

Simon continues to watch over everyone’s activities, ensuring things run smoothly whilst helping Jack finish an epic Silverton proposal. He is also shaping Phase II of Sinawava and reading through lots of legal stuff.

Matt Jones is back in the studio and reacclimatising to life outside a yurt . Conversation on Monday was particularly difficult but now he’s back in the swing of things and using this period of adjustment to get down to writing ‘proposals and things’.

Jack is here, there and everywhere. Where is he? No one knows. We do know however that he is making an important decision today. He is also doing a little bit on Ouray, helping Matt Jones ‘back into the dough like a fine yeast’ and taking some time out with Matt Webb to discuss BERG plans.

Apart from chats with Jack, Matt Webb is out and about at various talks / meetings, and is hoping to spend what little free time he has running through some company admin.

James is refactoring server database structures amongst other things, which, makes a lot of sense if you know what’s going on, but is too complex for me to explain in week notes.

As is the way of Denise, she is being a helper and a guider, and doing a little bit of lots of things, most notably helping Alex with Little Printer stuff and continuing her super cute work on Ouray.

Alex is continuing his Little Printer marathon this week by arranging photoshoots, working on instruction manuals, sticky labels, and an array of UI bits.

Aside from the regulars, we have the continued pleasure of Eddie Shannon and Phil Gyford’s company, with them working on Lamotte and Antero respectively. Eddie has been whittling down a mass of exciting concepts to around 10/11 ‘super solid ones’, aided by Joe who is also doing some video prototyping. Phil is being his usual fantastic self and ‘glueing together stuff from last week’.

I am elbow deep in spreadsheets, working on budgets and end of month/year things. I am also helping Alice with the weekend’s activities and writing week notes on Tuesday. 

Before this:

After this:

No Comments or Trackbacks

Leave a Comment

Recent entries from
Helen Rogers

Popular Tags